Monday, March 27, 2023

Tech Report - Letter of Transmittal

 

2 April, 2023

Subject: Transmittal of Proposal Report

  To : BCA Construction Productivity & Quality Group

  Dear Ms. Adeline Loo (Director),

 

In response to a letter of authorization dated 1 March, 2023, the team submits herewith a design proposal report entitled “Emboldening Design for Manufacturing and Assembly (DfMA) in Construction: A Productivity Boost from Small to Big” along with this letter.

 

Our study proposes a new solution system of DfMA technology in terms of lightweight prefabricated/ prefitted non-load bearing walls to be available in local prefabrication plants that is designed to address the constraints of small-scale construction projects. In the way to boost their construction efficiency, reduce overall costs engaged, and increase their profitability.

 

We would like to thank you for reading through the proposal. We hope that this proposal will provide you with sufficient details on the potential improvements to make DfMA technology widely used in construction even in small scale projects. Questions relating to any aspects of the proposal should be directed at us. Your consideration of our proposal is greatly appreciated.

 

 

Yours sincerely,

DfMA Studies Team

No comments:

Post a Comment

Critical thinking reflection

  When I first received the notification email of the module intake for this trimester, I was wondering why do we need to take a module name...